Forte C.R.E. No. 24.

Kowloon Canton Railway.

BRITISH SECTION

ESTIMATE.

Main Head Bridges.

Sub. Head Major No.8.

Work Tour 20' Archos with Pier Abut at Chain 12:150

DESCRIPTION Quantity Rate Unit AMOUNT C.R.E. No.9531. Cts. Excavation in founds. Timbering and Pumping. 5000 1:6 1:cu 8300 00. Concrete in founds and over Arches. 4550 1.650 7507 50. Masonry in Footings. 19500 35/ 6825 00. Superstructure. 1 £ 10/- for 250 40/- 40/- Arches. 850 2/- 0.ft. 1700 00. Coping. Dry Stone Pitching. 6100 10/- 2/ c.ft. 610 00. Total 29407 50. Contingencies 10% 2940 75. Grand Total $32348 28.

Edit History

2026-06-04 21:19:02 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Forte C.R.E. No. 24. Kowloon Canton Railway. BRITISH SECTION ESTIMATE. Main Head Bridges. Sub. Head Major No.8. Work Tour 20' Archos with Pier Abut at Chain 12:150 DESCRIPTION Quantity Rate Unit AMOUNT C.R.E. No.9531. Cts. Excavation in founds. Timbering and Pumping. 5000 1:6 1:cu 8300 00. Concrete in founds and over Arches. 4550 1.650 7507 50. Masonry in Footings. 19500 35/ 6825 00. Superstructure. 1 £ 10/- for 250 40/- 40/- Arches. 850 2/- 0.ft. 1700 00. Coping. Dry Stone Pitching. 6100 10/- 2/ c.ft. 610 00. Total 29407 50. Contingencies 10% 2940 75. Grand Total $32348 28.
Baseline (Original)
S8: .BWliBЯ notneD noolwod Morro32 HEFTISIJI 3TAMIT23 .17 Hate A I ZOTTI MRO Forte C.R.E. No. 24. Kowloon Canton Railway. BRITISH SECTION ESTIMATE. baalt ninN Main Head pridges. basti duž Sub. Head Major No.8. dow Work Tour 20' Archos with Pier Abut at Chain 12:150 Quantity. DESCRIPTION, 83 C.R.E. No.9531. Rate. Unit. AMOUNT. Cts. 1:༣ 5000 Excavation in founds. Itea Timbering and Pumping. [1.650 4550 Conorate in founds and evor Arches. Masonry in Footings. 35/ 19500 1 Superstructure. 10/- for 250 40/- 40/- £ 1000 00. 00. 4427 50. 1820 00. 7800 00. 5900 # Arches. 2/- 0.ft. 850 # Coping. 6100 Dry Stone Pitching. 10/- 2/ c.ft. 11800 00. 1700 00. 610 00. IBIOT 01 esiɔnignituoƆ IsoT bns1D Total Contingincies 10% Grand Total 29407 50. 2940 75. $32348 28.
2026-06-04 21:19:02 · Baseline
View content

S8:

.BWliBЯ notneD noolwod

Morro32 HEFTISIJI

3TAMIT23

.17 Hate A

I

ZOTTI MRO

Forte C.R.E. No. 24.

Kowloon Canton Railway.

BRITISH SECTION

ESTIMATE.

baalt ninN

Main Head pridges.

basti duž

Sub. Head Major No.8.

dow

Work Tour 20' Archos with Pier Abut at Chain

12:150

Quantity.

DESCRIPTION,

83

C.R.E. No.9531.

Rate. Unit.

AMOUNT.

Cts.

1:༣

5000

Excavation in founds.

Itea

Timbering and Pumping.

[1.650

4550

Conorate in founds and evor Arches.

Masonry in Footings.

35/

19500

1

Superstructure.

10/- for 250

40/- 40/- £

1000

00.

00.

4427 50.

1820 00.

7800 00.

5900

#

Arches.

2/- 0.ft.

850

#

Coping.

6100

Dry Stone Pitching.

10/-

2/ c.ft.

11800 00.

1700

00.

610 00.

IBIOT

01 esiɔnignituoƆ

IsoT bns1D

Total

Contingincies 10%

Grand Total

29407

50.

2940

75.

$32348 28.